Two items at the top are blocking real downstream work. The next three can happen on whatever schedule works.
The pick from brand guide v0.3 is upstream of Phase 4 (page templates) and Phase 5 (Shopify build). Specifically:
banner-with-tabs, B leans on collection-tabs, C leans on brand-logos + custom material blocks)The unblock: the moment Sean picks a direction + palette, I refine to the locked Phase 3 deliverable (final 5–7 colors, type system with fallbacks, fuller mocks including collection page and PDP, brand-voice document, italic-emphasis pattern documented as a system rule). That unlocks Phase 4 page templates immediately.
All hosted at jessar-deliverables.vercel.app. Click any to open in a new tab.
Items that don’t need any of the open inputs and won’t conflict with downstream choices:
Items that do need open inputs (Phase 2 IA mockups, Phase 4 page templates, Phase 3 brand guide refinement, hero PDP work) stay queued until the relevant unblock.
Code: github.com/RevShiftMedia/jessar-website · Live deliverables: jessar-deliverables.vercel.app · Live dashboard: progress.html in the repo (always reflects current state). PROJECT.md is the canonical source of truth.